4421 City of Fulton 2nd St

Image
Getting set up for pile driving  Starting to drive pile Setting up at bent 1 for preboring 

4421 City of Fulton 2nd St

Image
Coring and cutting getting ready to cut existing wall for bent 2 Finally finished hole with buried wing wall moving onto last hole for bent 2.

4421 City of Fulton 2nd St

Image
Still working on prebore for bent 2 Removing cut wall for bent 1 Breaking concrete for old wing wall beneath the ground in order to prebore hole Cutting face of existing end bent 2 Continue with prebore for bent 2 Still preboring at bent 2 Finished for the night. 7’ deep

4421 City of Fulton 2nd St

Image
Continue with prebore for bent 2 Cutting and core slab finishing end bent 1 Starting to place pile in bored holes Hole 6 complete with prebore 2 left at bent 

4421 City of Fulton 2nd St

Image
End bents excavated, coring and cutting on the west side sawing existing wall for end bent Boring machine arrived on site started to bore pile holes Finished the day with 2 holes completed 

4421 City of Fulton 2nd St

Image
Contractor has removed existing bridge deck setting up for prebore and then pile driving 

4421 City of Fulton 2nd st

Image
Contractor starting with bridge closure 

4421 City of Fulton 2nd St

Image