4421 City of Fulton 2nd St Bridge

Image
Waiting on asphalt trucks. Set waterproofing membrane on bridge deck Start placing 2nd lift of base asphalt 

4421 City of Fulton 2nd St Bridge

Image
Ready for asphalt placement  Start placing asphalt on the west side of bridge  Installation of handrails  Continue with asphalt on east side of bridge First lift of base completed. Will place the second layer tomorrow 

4421 City of Fulton 2nd st Bridge

Image
Pouring sidewalk for the South west side of Oak St Excavating south east side of oak St getting ready for concrete 

4421 City of Fulton 2nd St Bridge

Image
Pouring barrier walls for bridge Pouring retaining wall on South east Oak st Continue with barrier walls

4421 City of Fulton 2nd Bridge

Image
Setting forms for curb Curb poured and approach

4421 City of Fulton 2nd St Bridge

Image
Preparing for concrete pour Poured curb for drive  Excavating roadway on Oak and second Street Cutting concrete for construction joint

4421 City of Fulton 2nd St bridge

Image
Rebar is tied waiting on concrete  Started concrete pour Form for curb and gutters  Pour curb and gutter