4421 City of Fulton 2nd St Bridge Get link Facebook X Pinterest Email Other Apps May 31, 2023 Ready for asphalt placement Start placing asphalt on the west side of bridge Installation of handrails Continue with asphalt on east side of bridgeFirst lift of base completed. Will place the second layer tomorrow Get link Facebook X Pinterest Email Other Apps Comments
4421 City of Fulton 2nd St bridge May 12, 2023 Rebar is tied waiting on concrete Started concrete pour Form for curb and gutters Pour curb and gutter Read more
4421 City of Fulton 2nd St Bridge April 14, 2023 Mixing products for the UHPC UHPC employee checking to see if we have enough slump (spread) to pour Start pouring UHPC at bent 2 First hole had a leak under precast box Continue with bent 2 pour Continue with pour at bent 1 Finished pour 2:00pm Read more
4421 City of Fulton 2nd St March 23, 2023 Coring and cutting getting ready to cut existing wall for bent 2 Finally finished hole with buried wing wall moving onto last hole for bent 2. Read more